Project timeline
What the first four weeks actually look like
Week 1
Get everyone in one room
Kickoff, constraints, and a shared list of what we are not doing. That last one saves the most time.

Week 2
Wireframe the whole flow
Every screen sketched at low fidelity, so gaps in the flow surface before anything looks finished.

Week 3
Build the real screens
Layouts move into the file and start carrying real content. Real content changes decisions, so it arrives early.

Week 4
Review, refine, hand over
A full walkthrough with the team, then a clean handover with the reasoning written down beside the work.
